Norske Canada

 

Project Details

 

Location: Crofton, BC

Area of modular portion of building: 3,584 sf

Number of building modules: 6

Features:

This mill administration office was designed in a two-storey configuration to incorporate several diverse functions. The main floor services as reception, security and administration offices as well as a lunchroom, washrooms and a two-bed first aid room with access to a covered ambulance bay. The second floor provides a training classroom, offices, washrooms and shower area with locker room facilities.

Interior and exterior finishes were selected for durability as well as appearance including commercial hardware, cedar siding and 45ml EPDM roofing. Pot lights were used in the security section over sloped viewing windows to eliminate nighttime glare and deep overhangs over the windows for protection against heavy rain.